Sub-GHz ISM and SRD Frequency Bands by Region: 433 / 868 / 915 / 470 MHz

Summary

A region-by-region table of the license-free sub-GHz bands used by LoRa, ISM and SRD devices: 433 MHz (ITU Region 1 only), 868 MHz (Europe), 902-928 MHz (US), 470-510 MHz (China), 920 MHz (Japan), plus the LoRaWAN regional channel plans.

Regional band table

BandFrequency rangeWhere it appliesPower limitDuty cycle / accessNotes
433 MHz433.05–434.79 MHzITU Region 1 only (Europe, Africa, most of Asia). Not an ISM allocation in North America10 mW ERP (≈12.15 dBm EIRP) for non-specific SRD in Europe≤10 % duty cycle, or LBT + AFAShort allocation (1.74 MHz); fine for telemetry, crowded for dense networks
868 MHz863–870 MHzEurope (CEPT/ECC). Formally an SRD band, not an ITU ISM band — "868 ISM" is a nickname14 dBm ERP (25 mW, ≈16 dBm EIRP) on the main sub-bands; 869.4–869.65 MHz allows 27 dBm ERP (500 mW)Sub-band duty cycle: 863–865 MHz 0.1 %; 865–868 MHz 1 %; 868.0–868.6 MHz 1 %; 868.7–869.2 MHz 0.1 %; 869.4–869.65 MHz 10 %; 869.7–870 MHz 1 %The duty cycle applies to gateways too — downlink capacity is the usual bottleneck
915 MHz902–928 MHzUnited States (FCC), Canada, much of Latin America; mirrored by Australia 915–928 MHz1 W conducted (30 dBm); antenna gain up to 6 dBi → EIRP up to ≈36 dBm for fixed point-to-point under specific rulesNo duty cycle limit; frequency-hopping systems: ≤0.4 s dwell per channel in a 20 s windowThe most permissive regime of the three
China 470–510 MHz470–510 MHzChina, for civil metering and short-range micro-power devices50 mW ERP (≈17 dBm ERP / ≈19 dBm EIRP); PSD 50 mW/200 kHz when occupied bandwidth ≤200 kHzNo duty-cycle rule, but mandatory listen-before-talk that cannot be disabled, single transmission ≤1 s, one channel at a timeOccupied bandwidth ≤500 kHz; intended for building / residential / village-scale networks
Japan 920 MHz920.6–928.0 MHz typical for LoRa (statutory range 920.5–928.1 MHz)Japan (MIC / ARIB STD-T108)EIRP ≤16 dBm for conventional equipment (20 mW antenna power + 3 dBi antenna gain). Higher power classes exist for specific equipment categories — confirm the applicable class with your certifierMandatory carrier sense; transmission time limiter200 kHz channel grid
India 865–867 MHz865–867 MHzIndia (WPC/DoT, licence-exempt)30 dBm EIRP (1 W)No duty cycle limit under the LoRaWAN planConfirm bandwidth and PSD conditions with current WPC documents
Australia 915–928 MHz915–928 MHzAustralia (ACMA LIPD class licence)LoRaWAN AU915 default max EIRP +30 dBmNo duty cycle limit under the LoRaWAN planConfirm per-sub-band limits with current ACMA LIPD text

A note on units: EIRP (dBm) ≈ ERP (dBm) + 2.15. Europe regulates in ERP, the US in conducted power plus antenna gain. Comparing a European ERP limit with an American EIRP number without converting is a common 2 dB error.

LoRaWAN regional channel plans

If you deploy LoRaWAN, the regional plan (RP002) dictates the channels, not just the band:

PlanBandDefault join channelsDuty cycleMax EIRPRX2
EU868863–870 MHz868.10 / 868.30 / 868.50 (+ 867.1 / 867.3 / 867.5 / 867.7 / 867.9 — 8 channels typical)<1 %+16 dBm869.525 MHz / DR0
US915902–928 MHz64 × 125 kHz uplink (902.3–914.9, 0.2 MHz steps) + 8 × 500 kHz; 8 × 500 kHz downlink (923.3–927.5)None; ≤400 ms dwell per 125 kHz channel+30 dBm923.3 MHz / DR8
AU915915–928 MHz64 × 125 kHz uplink (915.2–927.8); downlink 923.3–927.5None+30 dBm923.3 MHz / DR8
CN470470–510 MHz96 × 200 kHz uplink (470.3–489.3); 48 × 200 kHz downlink (500.3–509.7). Deployments often use only the first channelsNone under RP002; Chinese rules require LBT and ≤1 s transmissions≈+19 dBmConfirm against RP002 for your build
AS923-1 (Japan)920.6–928.0 MHz actual923.20 / 923.40<1 % + 400 ms dwell; LBT mandatory in Japan+16 dBm923.2 MHz / DR2
IN865865–867 MHz865.0625 / 865.4025 / 865.985None+30 dBm866.550 MHz / DR2
KR920920.9–923.3 MHz922.10 / 922.30 / 922.50LBT+14 dBm921.90 MHz / DR0
RU864864–870 MHz868.9 / 869.1<1 %+16 dBm869.1 MHz / DR0
EU433433.05–434.79 MHz433.175 / 433.375 / 433.575<10 %+12 dBm434.665 MHz / DR0

Two deployment traps worth knowing:

1. US915 sub-bands. The 64 uplink channels are grouped into 8 sub-bands. If a device's channel mask does not match the gateway's sub-band, the device joins and then goes silent — the classic "joined but never heard again" fault. 2. EU868 downlink scarcity. The 1 % duty cycle binds the gateway as well. A single SF12 downlink frame over 1 s can force roughly 100× that time in silence on that sub-band.

Choosing an antenna band

Design targetBand to specifyAntenna implication
Europe only863–870 MHzTune for 868 MHz centre; check the whole band if you use 869.4–869.65 MHz at 500 mW
North America only902–928 MHz26 MHz of spectrum — the antenna must hold VSWR across the full range
China metering470–510 MHz40 MHz span; a 433 MHz antenna will not cover it — specify 470 MHz explicitly
Japan920–928 MHzDistinct from both 868 and 915; do not assume a "900 MHz" antenna covers it
Global SKU863–928 MHzOne wideband antenna (≈7 % fractional bandwidth) or a region-specific variant; see the LoRa selection guide

Beware the "433/868/915 MHz antenna" claim: a single element that truly covers 433–928 MHz is a compromise across more than an octave. Many such parts cover 868–915 well and 433 poorly. Ask for VSWR and efficiency plots across each band separately.

Related

Sources

  • LoRa Alliance, RP002-1.0.3 LoRaWAN Regional Parameters — https://lora-alliance.org/wp-content/uploads/2021/05/RP-2-1.0.3.pdf (accessed 2026-10-26)
  • ETSI EN 300 220 (SRD) — https://www.etsi.org/deliver/etsi_en/300200_300299/220/ (accessed 2026-10-26)
  • FCC 47 CFR Part 15 — https://www.ecfr.gov/current/title-47/chapter-I/subchapter-A/part-15 (accessed 2026-10-26)
  • MIIT 2019 Announcement No. 52, Micro-power short-range radio equipment catalogue and technical requirements — https://zh.wikisource.org/wiki/微功率短距离无线电发射设备目录和技术要求 (accessed 2026-10-26)
  • ITU Radio Regulations, Article 5 ISM footnotes 5.138 / 5.150 / 5.280 — https://www.itu.int/pub/R-REG-RR (accessed 2026-10-26)

---

Regulatory limits vary by country and change over time. The values above reflect the cited standards as of October 2026. Always confirm with your local regulator — and with your certification house — before deployment.

Frequently Asked Questions

Can I ship one 868 MHz product worldwide?
No. 868 MHz is not a license-free band in the US, and 915 MHz is not available in Europe. A global SKU needs a band-agile radio plus an antenna that covers both, or regional variants.
Why does my 433 MHz device fail certification in the US?
Because 433.05–434.79 MHz is an ITU Region 1 ISM allocation. In the US that spectrum is allocated to other services and 433 MHz devices generally require a different authorisation path.
What is the real difference between 868 and 915 for range?
Very little in propagation — 5 % in frequency. The differences that matter are regulatory: duty cycle and EIRP. US915 typically reaches further simply because it may transmit more often and louder.
Does the duty cycle limit apply to my gateway too?
Yes in Europe, and downlink is usually the first thing to hit the limit. This is why EU868 gateways are often specified with 8 channels and careful downlink scheduling.
What is the minimum order quantity and lead time?
Standard models ship in 7–15 working days after order confirmation; samples of in-stock models can ship within 3 days. MOQ depends on the model — contact us for the exact figure for your part number.
Can AntennaHome customize an antenna for my device?
Yes. We provide customized design including frequency tuning, connector and cable length, housing and mounting method. Send us your enclosure drawing, available ground plane size and target bands, and our RF engineers will propose a design.
What certifications and test reports are available?
Products are RoHS and REACH compliant. We operate an in-house 3D anechoic chamber and can provide VSWR, gain and radiation pattern test reports for the specific part number you order.

Request a Quote or Sample

We reply within one business day. Or email us directly.